/asplos-workflow
Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027
$ npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill asplos-workflow --agent claude-codeHow it fires
How this skill gets triggered: by you, by Claude, or both.
- Fires itselfAuto-invocation. Claude auto-loads it when your prompt matches the work.Auto-invocation is when the right skill fires by itself at the right moment, driven by a FLOW.md router and a hook, instead of you invoking it by name. It is the difference between a skill being installed and a skill actually getting used.Read the full definition →
- You can call itInvoke it directly when you want it.
- Slash command
/asplos-workflow
Context preview
The summary Claude sees to decide when to auto-load this skill.
Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027
SKILL.md
asplos-workflow.SKILL.mdname: asplos-workflow
description: Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027 conference in Crete, with owners per risk.
ASPLOS Workflow
An ASPLOS campaign is a pipeline with two entry gates per edition and a revision side-channel, not a single deadline sprint. All dates below are the verified 2027 cycle (CFP and conference site, checked 2026-07-08); reopen the official pages before committing a team to any of them.
The 2027 cycle as a calendar
| Gate | April cycle | September cycle | |---|---|---| | Full-paper deadline (11:59 PM AoE) | April 15, 2026 — **passed** | **September 9, 2026 — the live gate** | | Author response | July 6-9, 2026 — **open this week** (as of 2026-07-08) | December 1-4, 2026 | | Notification | July 27, 2026 | December 21, 2026 | | Major Revision due | camera-ready deadline, 6 weeks after notification | camera-ready deadline, 6 weeks after notification | | Conference | April 11-15, 2027, Heraklion, Crete, Greece | same |
There is no separate abstract deadline in 2027, and no mid-year third round — the edition moved from three deadlines to two. Missing September means waiting for the next edition's first gate.
Working backward from September 9, 2026
A credible countdown for a systems paper with hardware-dependent evidence:
T-10 weeks (by ~Jul 1) Freeze the claim list; run asplos-topic-selection;
choose evidence instruments (silicon / FPGA / simulator).
T-8 weeks Evaluation infrastructure done: baselines building,
workloads chosen, simulator configs pinned.
T-6 weeks First full results sweep; kill or descope claims the
data will not carry. Start the two-page draft NOW —
it is the part rapid review actually reads.
T-4 weeks Full draft; internal red-team against the rapid-review
question set; ablations running.
T-2 weeks Freeze experiments. Citation-format pass (full names,
no "et al.", DOIs). Anonymity sweep.
T-1 week HotCRP entry created; PDF uploaded; co-author sign-off.
T-0 Sep 9, 11:59 PM AoE HotCRP status shows *complete*, not draft.Role assignments that prevent known failures
- **Two-page owner** — one author owns pages 1-2 as a standalone artifact and
rehearses them against `asplos-writing-style`; rapid review reads nothing else.
- **Evidence-integrity owner** — keeps the experiment matrix (claims × platforms ×
baselines) current so the rebuttal window never requires new runs under pressure.
- **Compliance owner** — template, 11-page geometry, citation full-name rule, GenAI
disclosure, HotCRP fields; format violations risk rejection without review.
- **Response owner** — reserves the response window dates (Dec 1-4 for the September
cycle) on every author's calendar at submission time, not after reviews arrive.
Branch planning at notification (December 21, 2026)
1. **Accept** → switch to `asplos-camera-ready` immediately; camera-ready lands ~6 weeks out, and artifact evaluation (`asplos-artifact-evaluation`) runs in parallel with its own appendix and deadlines (2027 AE calendar 待核实). 2. **Major Revision** → treat as a funded contract, not a consolation: the revision is due at the camera-ready deadline and *counts as a submission*; scope revision work to exactly what the decision letter requires, tracked in a change log that will become the resubmission note. 3. **Reject at rapid review** → the diagnosis is almost always positioning: the first two pages did not establish the intersection or the evidence. Fix framing before considering a new venue. 4. **Reject after full review** → mine the reviews for the evidence matrix, then re-run `asplos-topic-selection`; some full-review rejects are strong ISCA, SOSP, or PLDI papers mis-aimed at the intersection.
Cross-edition cautions
- The two-deadline structure is itself new for 2027; do not assume it for 2028.
- ASPLOS logistics genuinely change year to year — the 2025 edition (30th, Rotterdam)
ran jointly with EuroSys; 2026 (31st) was standalone in Pittsburgh; 2027 is in Crete. Travel, visa, and registration planning must restart per edition (fees and attendance rules for 2027: 待核实).
- Program leadership rotates every edition; there is no standing editorial memory to
appeal to. A policy answer from a previous year's chairs is expired.
Hardware lead times are schedule items
Systems evidence has procurement physics that a paper calendar must absorb:
- Cluster or testbed reservations for the T-8 to T-2 sweep window book out weeks
ahead; reserve at claim-freeze time, not first-results time.
- FPGA synthesis iterations and simulator calibration runs are days-long serial
steps — one redesign late in the countdown costs a week, not an evening.
- Access to pre-production parts (new memory devices, engineering samples) often
comes with NDA review of the paper text; start that review before T-4 or it becomes the critical path.
Between notification and Crete
An accepted September-cycle paper has a compressed post-decision runway: camera-ready and any Major Revision work land ~6 weeks after December 21 — squarely across the holiday break, which the six-week plan must acknowledge — followed by artifact evaluation, then travel logistics for an April conference in Greece (visa timelines for some team members exceed the gap; start at notification). Presentation format, registration requirements, and speaker obligations for 2027 were 待核实 at pack-check time: read the acceptance email before assigning the talk.
Pipelining across gates
Teams running multiple projects
Read more
name: asplos-workflow description: Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027 conference in Crete, with owners per risk.
ASPLOS Workflow
An ASPLOS campaign is a pipeline with two entry gates per edition and a revision side-channel, not a single deadline sprint. All dates below are the verified 2027 cycle (CFP and conference site, checked 2026-07-08); reopen the official pages before committing a team to any of them.
The 2027 cycle as a calendar
| Gate | April cycle | September cycle | |---|---|---| | Full-paper deadline (11:59 PM AoE) | April 15, 2026 — **passed** | **September 9, 2026 — the live gate** | | Author response | July 6-9, 2026 — **open this week** (as of 2026-07-08) | December 1-4, 2026 | | Notification | July 27, 2026 | December 21, 2026 | | Major Revision due | camera-ready deadline, 6 weeks after notification | camera-ready deadline, 6 weeks after notification | | Conference | April 11-15, 2027, Heraklion, Crete, Greece | same |
There is no separate abstract deadline in 2027, and no mid-year third round — the edition moved from three deadlines to two. Missing September means waiting for the next edition's first gate.
Working backward from September 9, 2026
A credible countdown for a systems paper with hardware-dependent evidence:
T-10 weeks (by ~Jul 1) Freeze the claim list; run asplos-topic-selection;
choose evidence instruments (silicon / FPGA / simulator).
T-8 weeks Evaluation infrastructure done: baselines building,
workloads chosen, simulator configs pinned.
T-6 weeks First full results sweep; kill or descope claims the
data will not carry. Start the two-page draft NOW —
it is the part rapid review actually reads.
T-4 weeks Full draft; internal red-team against the rapid-review
question set; ablations running.
T-2 weeks Freeze experiments. Citation-format pass (full names,
no "et al.", DOIs). Anonymity sweep.
T-1 week HotCRP entry created; PDF uploaded; co-author sign-off.
T-0 Sep 9, 11:59 PM AoE HotCRP status shows *complete*, not draft.Role assignments that prevent known failures
- **Two-page owner** — one author owns pages 1-2 as a standalone artifact and
rehearses them against `asplos-writing-style`; rapid review reads nothing else.
- **Evidence-integrity owner** — keeps the experiment matrix (claims × platforms ×
baselines) current so the rebuttal window never requires new runs under pressure.
- **Compliance owner** — template, 11-page geometry, citation full-name rule, GenAI
disclosure, HotCRP fields; format violations risk rejection without review.
- **Response owner** — reserves the response window dates (Dec 1-4 for the September
cycle) on every author's calendar at submission time, not after reviews arrive.
Branch planning at notification (December 21, 2026)
1. **Accept** → switch to `asplos-camera-ready` immediately; camera-ready lands ~6 weeks out, and artifact evaluation (`asplos-artifact-evaluation`) runs in parallel with its own appendix and deadlines (2027 AE calendar 待核实). 2. **Major Revision** → treat as a funded contract, not a consolation: the revision is due at the camera-ready deadline and *counts as a submission*; scope revision work to exactly what the decision letter requires, tracked in a change log that will become the resubmission note. 3. **Reject at rapid review** → the diagnosis is almost always positioning: the first two pages did not establish the intersection or the evidence. Fix framing before considering a new venue. 4. **Reject after full review** → mine the reviews for the evidence matrix, then re-run `asplos-topic-selection`; some full-review rejects are strong ISCA, SOSP, or PLDI papers mis-aimed at the intersection.
Cross-edition cautions
- The two-deadline structure is itself new for 2027; do not assume it for 2028.
- ASPLOS logistics genuinely change year to year — the 2025 edition (30th, Rotterdam)
ran jointly with EuroSys; 2026 (31st) was standalone in Pittsburgh; 2027 is in Crete. Travel, visa, and registration planning must restart per edition (fees and attendance rules for 2027: 待核实).
- Program leadership rotates every edition; there is no standing editorial memory to
appeal to. A policy answer from a previous year's chairs is expired.
Hardware lead times are schedule items
Systems evidence has procurement physics that a paper calendar must absorb:
- Cluster or testbed reservations for the T-8 to T-2 sweep window book out weeks
ahead; reserve at claim-freeze time, not first-results time.
- FPGA synthesis iterations and simulator calibration runs are days-long serial
steps — one redesign late in the countdown costs a week, not an evening.
- Access to pre-production parts (new memory devices, engineering samples) often
comes with NDA review of the paper text; start that review before T-4 or it becomes the critical path.
Between notification and Crete
An accepted September-cycle paper has a compressed post-decision runway: camera-ready and any Major Revision work land ~6 weeks after December 21 — squarely across the holiday break, which the six-week plan must acknowledge — followed by artifact evaluation, then travel logistics for an April conference in Greece (visa timelines for some team members exceed the gap; start at notification). Presentation format, registration requirements, and speaker obligations for 2027 were 待核实 at pack-check time: read the acceptance email before assigning the talk.
Pipelining across gates
Teams running multiple projects
Stanford REAP × CoPaper.AI · 由斯坦福实证方法论团队精选与维护 访问 copaper.ai 微信:CoPaper.AI 按 11 个主流学科板块覆盖 经管与商科 社会科学 人文学科 数学与物理科学 生命科学 医学与健康 工程与技术 计算机科学与 AI 体育科学 点击任一学科名可跳转到对应说明;每类下的代表子领域在正文总览中完整列出。下方封面墙按 venue 导航,完整分类见覆盖一览。 🧭 布局指南 · 📚 Skill Pack 一览 · ⚡ 如何使用 · 🧪 自动实证
Other skills on awesome-journal-skills.
- /aaai-artifact-evaluation
Use when packaging AAAI code, data, multimedia appendices, technical appendices, reproducibility evidence, and post-acceptance artifact releases without violating double-blind or immutable-supplement rules.
Open skill - /aaai-author-response
Use when drafting an AAAI author response (rebuttal) under the single short character-limited author-feedback window, the no-URL rule, no-new-results guidance, AI-generated-review handling, and the AAAI two-phase review process where Phase-2 papers receive one feedback round
Open skill - /aaai-camera-ready
Use when preparing an accepted AAAI paper for camera-ready source submission to AAAI Press, including proceedings page limits, two-column template compliance, copyright transfer, purchased extra technical pages, deanonymization, registration, oral or poster presentation, and
Open skill - /aaai-experiments
Use when designing or auditing AAAI experiments for the broad-AI program committee, including baselines, ablations, statistical significance, robustness, human evaluation, AI-for-Social-Impact and alignment/safety evidence, compute and cost reporting, and
Open skill - /aaai-related-work
Use when positioning an AAAI paper's novelty against archival work, contemporaneous arXiv or workshop papers, and AAAI/IJCAI/NeurIPS/ICML/ICLR neighbors across the broad AI scope, while staying inside AAAI's dual-submission and AI-as-source policy constraints and writing a
Open skill - /aaai-reproducibility
Use when strengthening an AAAI paper's reproducibility checklist (placed after references), experimental traceability, seed and hyperparameter reporting, compute and cost disclosure, dataset access and licensing, code/data ZIP readiness, and the claim-to-evidence map that
Open skill

