aaai-artifact-evaluati…
Use when packaging AAAI code, data, multimedia appendices, technical appendices, reproducibility evidence, and post-acceptance artifact releases without…
Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027
$ npx -y skills add brycewang-stanford/Awesome-Journal-Skills --skill asplos-workflow --agent claude-codeHow it fires
How this skill gets triggered: by you, by Claude, or both.
/asplos-workflowContext preview
The summary Claude sees to decide when to auto-load this skill.
Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027
name: asplos-workflow description: Use when planning an ASPLOS campaign across the two-deadline cycle — sequencing evidence building, the September 9, 2026 submission gate, author-response windows, the December 21 notification, Major Revision resubmission six weeks later, artifact evaluation, and the April 2027 conference in Crete, with owners per risk.
An ASPLOS campaign is a pipeline with two entry gates per edition and a revision side-channel, not a single deadline sprint. All dates below are the verified 2027 cycle (CFP and conference site, checked 2026-07-08); reopen the official pages before committing a team to any of them.
| Gate | April cycle | September cycle | |---|---|---| | Full-paper deadline (11:59 PM AoE) | April 15, 2026 — **passed** | **September 9, 2026 — the live gate** | | Author response | July 6-9, 2026 — **open this week** (as of 2026-07-08) | December 1-4, 2026 | | Notification | July 27, 2026 | December 21, 2026 | | Major Revision due | camera-ready deadline, 6 weeks after notification | camera-ready deadline, 6 weeks after notification | | Conference | April 11-15, 2027, Heraklion, Crete, Greece | same |
There is no separate abstract deadline in 2027, and no mid-year third round — the edition moved from three deadlines to two. Missing September means waiting for the next edition's first gate.
A credible countdown for a systems paper with hardware-dependent evidence:
T-10 weeks (by ~Jul 1) Freeze the claim list; run asplos-topic-selection;
choose evidence instruments (silicon / FPGA / simulator).
T-8 weeks Evaluation infrastructure done: baselines building,
workloads chosen, simulator configs pinned.
T-6 weeks First full results sweep; kill or descope claims the
data will not carry. Start the two-page draft NOW —
it is the part rapid review actually reads.
T-4 weeks Full draft; internal red-team against the rapid-review
question set; ablations running.
T-2 weeks Freeze experiments. Citation-format pass (full names,
no "et al.", DOIs). Anonymity sweep.
T-1 week HotCRP entry created; PDF uploaded; co-author sign-off.
T-0 Sep 9, 11:59 PM AoE HotCRP status shows *complete*, not draft.rehearses them against `asplos-writing-style`; rapid review reads nothing else.
baselines) current so the rebuttal window never requires new runs under pressure.
disclosure, HotCRP fields; format violations risk rejection without review.
cycle) on every author's calendar at submission time, not after reviews arrive.
1. **Accept** → switch to `asplos-camera-ready` immediately; camera-ready lands ~6 weeks out, and artifact evaluation (`asplos-artifact-evaluation`) runs in parallel with its own appendix and deadlines (2027 AE calendar 待核实). 2. **Major Revision** → treat as a funded contract, not a consolation: the revision is due at the camera-ready deadline and *counts as a submission*; scope revision work to exactly what the decision letter requires, tracked in a change log that will become the resubmission note. 3. **Reject at rapid review** → the diagnosis is almost always positioning: the first two pages did not establish the intersection or the evidence. Fix framing before considering a new venue. 4. **Reject after full review** → mine the reviews for the evidence matrix, then re-run `asplos-topic-selection`; some full-review rejects are strong ISCA, SOSP, or PLDI papers mis-aimed at the intersection.
ran jointly with EuroSys; 2026 (31st) was standalone in Pittsburgh; 2027 is in Crete. Travel, visa, and registration planning must restart per edition (fees and attendance rules for 2027: 待核实).
appeal to. A policy answer from a previous year's chairs is expired.
Systems evidence has procurement physics that a paper calendar must absorb:
ahead; reserve at claim-freeze time, not first-results time.
steps — one redesign late in the countdown costs a week, not an evening.
comes with NDA review of the paper text; start that review before T-4 or it becomes the critical path.
An accepted September-cycle paper has a compressed post-decision runway: camera-ready and any Major Revision work land ~6 weeks after December 21 — squarely across the holiday break, which the six-week plan must acknowledge — followed by artifact evaluation, then travel logistics for an April conference in Greece (visa timelines for some team members exceed the gap; start at notification). Presentation format, registration requirements, and speaker obligations for 2027 were 待核实 at pack-check time: read the acceptance email before assigning the talk.
Teams running multiple projects
Stanford REAP × CoPaper.AI · 由斯坦福实证方法论团队精选与维护 访问 copaper.ai 微信:CoPaper.AI 按 11 个主流学科板块覆盖 经管与商科 社会科学 人文学科 数学与物理科学 生命科学 医学与健康 工程与技术 计算机科学与 AI 体育科学 点击任一学科名可跳转到对应说明;每类下的代表子领域在正文总览中完整列出。下方封面墙按 venue 导航,完整分类见覆盖一览。 🧭 布局指南 · 📚 Skill Pack 一览 · ⚡ 如何使用 · 🧪 自动实证
Use when packaging AAAI code, data, multimedia appendices, technical appendices, reproducibility evidence, and post-acceptance artifact releases without…
Use when drafting an AAAI author response (rebuttal) under the single short character-limited author-feedback window, the no-URL rule, no-new-results guidance,…
Use when preparing an accepted AAAI paper for camera-ready source submission to AAAI Press, including proceedings page limits, two-column template compliance,…
Use when designing or auditing AAAI experiments for the broad-AI program committee, including baselines, ablations, statistical significance, robustness, human…
Use when positioning an AAAI paper's novelty against archival work, contemporaneous arXiv or workshop papers, and AAAI/IJCAI/NeurIPS/ICML/ICLR neighbors across…
Use when strengthening an AAAI paper's reproducibility checklist (placed after references), experimental traceability, seed and hyperparameter reporting,…